"Well, i can route the construction of wind turbine to Condris and especially Tullion's (which is where the 99% is) mountain's but Diamond Heart's will be an issue. The reason why is because of the Governor, George Wallace, there is one tough cookie. Hard cold Conservative and Pro-Gas/Coal. Thinks in his words 'that turbine and solar are the works of the devil and socialists.' I know that without any doubt that he will try to stop me from building turbines in his state, even in the mountains. Ultra-Nationalist, Ultra-Religious, and Ultra-Anti-EU (If that can be a term at all). But back to Condris and Tullion, that would not be an issue. The worst that would come is some compliant from the populace there, but if they can compensate from the Common Government then they will be fine with it at most."
The President sighed as he continued.
"I would agree with you on the constitutional reform. Maybe I will get lucky in the National Congress election in this coming December and implement something before my administration ends in April 2021. Now, on how much inversion for this year from the EU Fund, the Ministry of Treasury and Ministry of the Interior through a joint estimate to me said that a 15,000,000,000 Sulias (SA) would solve the problem to almost 85% in the East with the West at 100%, which equates to €23,100,000,000. But i am willing to doubt, no offence, that the Commonwealth would even recieve that amount from the EU fund. So, i am wanting to ask for €12,000,000,000 for this year to fund the construction of three additional high level producing solar plants and various wind turbines in the mountains to power up at least 65% in the East within the next two years. But in terms for five years, i imagine that in total if you want the full number for a 100% in the East, it is estimated that we would need €40,000,000,000 in total for the next five years. If the program is done right, especially after my tenure as President and the new person whoever that is in 2021, then the Energy Crisis should hopefully be solved to at least a minimal level. The reason why for the high cost is that we have to import the parts and tools for the work. The crews have to use a specially made drill that can dig deep through sand and the sandstone below to where it connects from one part of the Commonwealth to another, particularly the sandy parts. Whenever a sandstorm happens in the East, it becomes powerfully and caused serious destruction with how much windspeed it has. In fact, there is a picture in the binder of one sandstorm that happened in Vernach's territorial capital back in 1928."

"Most of the buildings in the capital of Vernach would be damaged beyond recognition and those poles were one of the first things to collapse. The Common Government, here in Tullion, did not even learn about the tragedy until about 6 days afterward, the city had become cut off from the rest of the world because there were no electricity remaining that was connected to call for help. So, these poles were made to remain lodged in the sand and ground to ensure that it remained standing by the end of sandstorm with a few number, but not all of them, having a phone to call for assistance in case of a repeat of 1928."

"That is why the cost for a project like this is great, but the Common Government does not want to cut corners for something like this. "