Timeline of Development | Military Equipment Projects in Reitzmag
-
(under development)
-
PROJECT EAGLE
Specifications:
Target Value Actual Value Crew Capacity 1 or 2 Maximum speed Mach 2.15+ Range 3,800 km (2,400 mi, 1,750 nmi) Combat range 1,500 km (932 mi, 810 nmi) Ferry range 5,000 km (3,107 mi, 2,700 nmi) Service ceiling 2,000 km (1,200 mi, 1,100 nmi) Rate of climb 300 m/s (59,000 ft/min) RCS 0.001 m^2 or lower Gun GSh-23 External Hardpoints 6 Internal Bay Capacity 8
Development Timeline:
February 10 2021 - Design Phase Begins
February 20 2021 - First Design Made
March 1 2021 - Wind Tunnel Testing of First Design
March 4 2021 - Second Design Made
March 18 2021 - Wind Tunnel Testing of Second Design
March 26 2021 - Scaled-up model made
March 30 2021 - Scaled-up model Wind Tunnel test
April 5 2021 - Minor adjustments to design
June 3 2021 - Final Design
July 15 2021 - Prototype construction begins -
This post is deleted! -
PROJECT THUNDERBOLT II
Specifications:
Target Value Actual Value Launch Platform Ship, Submarine, Aircraft, MLRS Maximum speed Mach 5+ Operational Range 1,000 km (620 mi) RCS 0.001 m^2 or lower
Development Timeline:
November 4 2020 - Design Phase Begins
January 6 2021 - First Design Made
January 10 2021 - First Wind Tunnel Testing
January 17 2021 - Second Wind Tunnel Testing
January 24 2021 - Scale Model Construction
February 12 2021 - Scale Model Launch Test
February 25 2021 - Scale Model Second Launch Test
March 10 2021 - Design adjustments made, size specifications finalized
March 29 2021 - First Prototype built
April 7 2021 - Wind Tunnel Test of First Prototype