NS European Union

    • Register
    • Login
    • Search
    • Categories
    • Recent
    • Tags
    • Popular
    • Users
    • Groups
    • Discord

    European Development Agency

    European Stock Exchange
    9
    51
    6499
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • Istkalen
      Istkalen EU last edited by Istkalen

      The One, Holy, Catholic, and Apostolic Church, legally and unfortunately recognized only as the Arian Apostolic Church, warns that it is now highly likely that a major accident will occur on 1 June 2023 at 08:32 IST at the Nuclear Power Plant of the Transfiguration. We implore the Commission to provide funding as soon as is practicable so that we may conduct emergency mitigation to prevent the further deterioration of the reactor core and thus protect the lives and safety of Istkaleners and Europeans.

      The Lord be with you,

      TABITHA
      Supreme Pontiff

      HH Erkas Tilisek
      President of the Governorate

      HH Sirisik Gingivitis
      Secretary of the Office for Energy

      HH Merte Maksile
      Secretary of the Office for Nuclear Security

      BrumBrum 1 Reply Last reply Reply Quote 1
      • BrumBrum
        BrumBrum Commission @Istkalen last edited by BrumBrum

        Name of the state: United Duchies
        Intended use for the subsidy: Development of Electric or hybrid Passenger Airliner
        Requested form of subsidy: Grant(Preferred) or Loan
        Amount of money requested (In Euros): 6 billion Euros
        5 years
        Proposed interest per annum (filled out only if the requested form of subsidy is a low-interest loan): Will listen to comission
        Justification for the request: Recognising the carbon footprint of airliners and the issue of adressing aviation emissions. We seek to develop a European airliner with EU funds that is eletric and and can replace jet aircraft in the regional aircraft market of up to 150 passenger capacity planes. If we can move these aircraft to electric or hybrid biofuels-electric airliner. The aim would be to assist manufactaurers such as Airbus with the development of the technology by having a public funded programme to develop the technology to speed up its adoption in the future. This will be a vital step in sustainable economic green development to enable a quick transition to low carbon aviation.

        1 Reply Last reply Reply Quote 0
        • Istkalen
          Istkalen EU last edited by Istkalen

          The One, Holy, Catholic, and Apostolic Church, legally and unfortunately recognized only as the Arian Apostolic Church, warns that it will resort to legal recourse to ensure a response to its legitimate application to the EDA if no acceptance or rejection is given by 15 June 2023.

          The Lord be with you,

          TABITHA
          Supreme Pontiff

          HH Erkas Tilisek
          President of the Governorate

          HH Sirisik Gingivitis
          Secretary of the Office for Energy

          HH Merte Maksile
          Secretary of the Office for Nuclear Security

          1 Reply Last reply Reply Quote 0
          • BrumBrum
            BrumBrum Commission last edited by BrumBrum

            Name of the state: Svarna Surya
            Intended use for the subsidy: High Speed Railway construction(Part grant)
            Requested form of subsidy: Grant
            Amount of money requested (In Euros):5 Billion Euros
            Proposed time-frame in which the loan will be payed back (filled out only if the requested form of subsidy is a interest-free loan or a low-interest loan):-
            Proposed interest per annum (filled out only if the requested form of subsidy is a low-interest loan): -
            Justification for the request: We increasingly need to find more efficient ways to move citizens around because of the traffic congestion on motorways. We believe a high speed rail project from Mumba-Naya Dilli-Agra-Allahabad-Bahawalpur-Sarghoda with a spur to Raipur and Bhopal and to Beirellia
            alt text

            BrumBrum 1 Reply Last reply Reply Quote 0
            • BrumBrum
              BrumBrum Commission @BrumBrum last edited by BrumBrum

              Name of the state:Svarna Surya
              Intended use for the subsidy:Svarna Highway Link:Development of Highways to be paid back by tolls
              Requested form of subsidy:Loan
              Amount of money requested (In Euros):4 Billion Euros(part funding)
              Proposed time-frame in which the loan will be payed back (filled out only if the requested form of subsidy is a interest-free loan or a low-interest loan):10 years
              Proposed interest per annum (filled out only if the requested form of subsidy is a low-interest loan):-
              Justification for the request:We need to develop the transportation links between our cities. We are proposing EU loan 4 billion Euros of the 10 billion Euros required to complete 1,000 km of highways connecting core cities down the main corridor in Svarna Surya. The amount will be paid back with tolls generated by the road.

              1 Reply Last reply Reply Quote 0
              • Spain
                Spain last edited by


                On the Applications from "Pope" Tabitha and the United Duchies Airliner Proposal

                To the interest of "Pope" Tabitha and the Prime Minister of the United Duchies:

                The European Commission, formed by Premier Commissioner Jean-Claude Juncker, Internal Affairs Commissioner Wirt Harland and Foreign Affairs Commissioner Antoni Reynels, has reached a decision on these two applications.

                1. Concerning the request from "Pope" Tabitha, the Commission has REJECTED the application on a 2-0 vote. The Commission believes that the applicant is a dangerous individual, and a interest-free loan that will be paid in 40 years is completely dangerous to the principle of paying back after the expense of said funds.

                2. Concerning the application from the United Duchies Government, the Commission has decided to REJECT the request on a 2-1 vote. The Commission believes that the application goes against the principles of the European Development Agency, that was not created to give loans to private companies like Airbus. In addition, the Commission notes that Airbus is not a fully-Duchian company, and that the United Duchies has not made clear if other states support their idea.

                Other pending applications will be responded in due curse.

                Receive my kindest regards,

                Jean-Claude Juncker
                Premier Commissioner of the European Union

                The Kingdom of Spain
                His Majesty the King, Felipe VI
                President Alberto Núñez-Feijóo
                Councillor and Council Speaker Donald Tusk

                BrumBrum 1 Reply Last reply Reply Quote 0
                • BrumBrum
                  BrumBrum Commission @Spain last edited by BrumBrum

                  Name of the state: United Duchies
                  Intended use for the subsidy: National Pedestrian Priority areas
                  Requested form of subsidy: Grant
                  Amount of money requested (In Euros): 5 Billion Euros
                  Proposed time-frame in which the loan will be payed back (filled out only if the requested form of subsidy is a interest-free loan or a low-interest loan):N/A
                  Proposed interest per annum (filled out only if the requested form of subsidy is a low-interest loan): N/A
                  Justification for the request: To provide a fund to pedestrianise core city centre areas throughout the United Duchies with at least 1 pedestrianised area in every city or town and to pedestrianise core shopping areas. These areas would also have a bike lanes down them to seperate bike traffic with these being protected to funnel bikes away from pedestrians and have service access to vehicles for deliveries during the non-business hours. Businesses would be given funds as part of the programme to switch to cycle deliveries for local areas. The aim would be to increase commerce and access to shops. The creation of low car zones has been proven to increase business by allowing for more passing foot traffic as people will feel safer to shop without cars or not having to worry about crossing the road. Buses would drop off passengers at the end of high streets and supermarkets with car parks would be at the end of the boundary of the pedestrianised zones. Where needed by passes would be built around the towns if the area to be pedestrianised is a main thoroughfare for the region.Where needed park and ride schemes would be created to get people into the shopping areas

                  1 Reply Last reply Reply Quote 0
                  • Spain
                    Spain last edited by


                    On the Applications from Svarna Surya and the United Duchies

                    To the interest of the Prime Ministers of Svarna Surya and the United Duchies:

                    The European Commission, formed by Premier Commissioner Jean-Claude Juncker, Internal Affairs Commissioner Wirt Harland and Foreign Affairs Commissioner Antoni Reynels, has reached a decision on these three applications.

                    1. Concerning the first request from Svarna Surya, the Commission has ACCEPTED the application on a 3-0 vote. The Commission believes that the applicant request is correct and agrees with the proposal made by Svarna Surya. The use of the European Development Agency funds for this project is reasonable and it is applauded by the members of the Commission.

                    2. Regarding the second request from Svarna Surya, the Commission has ACCEPTED the application on a 3-0 vote. We believe that Svarna Surya, through the toll system they wish to implement in order to pay back, meets the requisites set by this Commission to be given the necessary funds.

                    3. Concerning the application from the United Duchies Government, the Commission has decided to REJECT the request on a 2-1 vote. The Commission believes that five billion Euros is a huge amount of money for the proposed project, an argument that becomes stronger when another member state of the European Union is building a high speed railway network with the same amount of money.

                    Receive my kindest regards,

                    Jean-Claude Juncker
                    Premier Commissioner of the European Union

                    The Kingdom of Spain
                    His Majesty the King, Felipe VI
                    President Alberto Núñez-Feijóo
                    Councillor and Council Speaker Donald Tusk

                    BrumBrum 1 Reply Last reply Reply Quote 0
                    • BrumBrum
                      BrumBrum Commission @Spain last edited by BrumBrum

                      Name of the state:United Duchies
                      Intended use for the subsidy:Solar Retrofit Programme
                      Requested form of subsidy:Grants
                      Amount of money requested (In Euros):5,000,000,000 Euros(preferably per year for 10 years to accelerate the programme)
                      Proposed time-frame in which the loan will be payed back (filled out only if the requested form of subsidy is a interest-free loan or a low-interest loan):-
                      Proposed interest per annum (filled out only if the requested form of subsidy is a low-interest loan):-
                      Justification for the request: To retrofit older buildings in the Duchies with solar systems for electricity backed up by a battery and solar water systems where appropriate. This would part pay for a programme to install systems on almost a million buildings this year with plans to put it on over 30 million existing dwellings over 10 years. The money would go to state owned energy and utility providers who would install them on people houses with householders and building owners getting a reduced electricity rate for agreeing on installations in their property.This would strengthen the grid and increase solar capacity by having batteries storing energy in a decentralized fashion. It will also help with out aim of delivering a home battery pack to every home in the Duchies within 10 years to reduce the effect of short power cuts from the grid side making sure blackouts if they occur for short periods of time don't shut down entire areas.The programme will also increase jobs in installation and therefore economic growth.The cost to install the average solar and smart powerwall system is about 20,000 euros average or so depending on size of property. This grant will part cover the cost of the programme this year.The hope is to drop the price per installation over time.Excess power of there is any on a particular day will be sold to other countries or stored in battery farms that are being built around the country or in electric car batteries through vehicle to grid technology.

                      This is the projected costs and targets:

                      Type of Building Buildings % Solar Solar on Roof Average Generating Capacity KwH Generation Percent of Solar Target 10 years KwH With Target Projected Cost over 10 years EU Funding %
                      Single Family Homes 25,648,291 8.90% 2,282,698 11000 25,109,677,270 7.26% 20,518,633 225,704,963,000 €364,718,701,327.49 -
                      Apartment Blocks / mixed use 600,864 4.90% 29,442 60900 1,793,038,262 0.52% 525,056 31,975,910,400 €17,114,654,932.50 -
                      Other buildings 1,966,543 6.90% 135,691 70,350 9,545,894,703 2.76% 1,253,850 88,208,347,500 €83,861,889,975.00 -
                      Total 28,215,698 20.70% 2,447,832 14,890 36,448,610,236 10.53% 22,297,539 345,889,220,900 €478,317,411,142.49 10.45%
                      1 Reply Last reply Reply Quote 0
                      • Istkalen
                        Istkalen EU last edited by

                        alt text


                        On the Applications from the United Duchies

                        To the attention of the government of the United Duchies:

                        The European Commission has reached a decision on the following two applications:

                        1. The subsidy request for the Cycle Super Highway System has been denied by a 3-0 vote, as the proposed project is seen as expensive and unlikely to create proportional benefit.

                        2. In regards to the subsidy request for the Solar Retrofit Program: the European Commission, in light of the cost and relative luxury of the proposed project, proposes, by 3-0 vote, a counter-offer of a single low-interest loan of 10 billion euros, at 1.8% interest and to be repaid in 15 years.

                        Wishing you continued and future happiness,

                        Akem Linek
                        Premier Commissioner of the European Union

                        1 Reply Last reply Reply Quote 0
                        • First post
                          Last post
                        Our forums are maintained by volunteers. Consider donating to help us cover our monthly expenses and keep everything up and running Donate