European Development Agency
-
We have consulted with cycling organisations and users on this project proposal and policy. One of the issues brought up was that leisure cyclists can be intimidated by commuting cyclists who can cycle up to 48 km/h and upwards of that . That is why the solution of a slower leisure bike path and a fast Superhighway with 1 lane in each direction was agreed upon. The lanes are already planned to be integrated into a big network of existing infrastructure near towns , villages and cities .
Forcing a compromise by essentially putting slower cyclists in the same cycle lanes would slow down commuting cyclists who want to get 48-64 km with great speed safely and having a mix of speeds in the same lanes would be dangerous. So the separation is essential for the functioning of the lane and for it to have high usage that contributes to our carbon reductions.
-
Apologies for the delays. Given that the EDA funding is almost depleted, it's my opinion that a decision on this should be deferred until a new budget is drawn up. However, I strongly disagree with the position of Commissioner Biden. There is no reason for a cycling network to be connected to a highway system, nor for it to be downsided. While I have concerns about the safety of a system which permits bikes, e-bikes, and e-scooters to use the same lanes, this is not directly related to the proposed project, and is therefore irrelevant.
In terms of a hypothetical decision I would make if re-elected or if there were enough funding - the loan would be granted, but preferably with an interest rate of between 0.5 to 1%, given that the United Duchies has the capacity to pay for the interest and that the EDA needs as much funding it can get. A higher interest rate is undesirable to me as one above 1% may have the risk of creating other complications in terms of funding for the proposed project.
Ilmaras Kalessed
Internal Affairs Commissioner -
In light if the new budget we would like to request an increased amount to develop more cycle super highways quicker
Name of the state:United Duchies
Intended use for the subsidy:Cycle Super Highway system(5,000 km)
Requested form of subsidy: Interest-free loan
Amount of money requested (In Euros):4,000,000,000 Euros -
Name of the state:
Republic of Istkalen
Intended use for the subsidy:
The modernization of the LWGR units at the Nuclear Power Plant of the Transfiguration (NPPT), as well as safety and efficiency improvements to attached nuclear recycling and storage facilities.
Requested form of subsidy:
Interest-free loan, paid to the Arian Apostolic Church.
Amount of money requested (In Euros):
2 500 000 000 euros
Proposed time-frame in which the loan will be payed back (filled out only if the requested form of subsidy is a interest-free loan or a low-interest loan):
40 years
Proposed interest per annum (filled out only if the requested form of subsidy is a low-interest loan): n/a
Justification for the request:
Following the dissolution of the German Autonomous Administration, we, the One, Holy, Catholic, and Apostolic Church, legally known, unfortunately, as the Arian Apostolic Church, have assumed governmental authority over the German Autonomous Territories, therefore becoming a state institution of the Republic of Istkalen able to directly request loans from the EDA.
The Nuclear Power Plant of the Transfiguration is currently highly dangerous, uniquely prone to meltdowns. If an accident were to occur, it is likely that the effects would be felt by all Europe, with radioactive fallout dispersed throughout the whole of the continent. We have deemed it necessary to make certain safety improvements to its facilities in order to avert such an occurence.
The safety of the nuclear recycling and storage facilities associated with the NPPT is also in question. While regularly monitored and without any obvious issues as of now, they are rapidly aging; the potential of a leak becomes more possible with each passing year, something which would have deleterious effects on their surroundings and leave them uninhabitable for what is effectively an indefinite amount of time. We therefore intend to carry out certain improvements and modernizations to these facilities in order to reinforce their security and ensure the maximum protection of the surrounding environment and population.
The central government of the Republic of Istkalen has already granted us a grant roughly equal to 5 000 000 000 euros to make these improvements; however, we have internally reckoned that this sum will not be enough to cover their full cost, leaving many possible flaws unfixed and thus our, as well as the European, population in greater danger. We therefore appeal to the EDA to send to us the remaining necessary funds, lest a major and fatal accident occurs at the NPPT and its associated facilities.
The Lord be with you,
TABITHA
Supreme PontiffHH Erkas Tilisek
President of the GovernorateHH Sirisik Gingivitis
Secretary of the Office for EnergyHH Merte Maksile
Secretary of the Office for Nuclear Security -
-
We'd like to put in a complaint about the slow processing of this application and other applications. This is unacceptable and will result in no spending of funds as grants and loans are held up . We would also like to know if denied EU funding for the cycle lanes the full reasoning from each commissioner as to why this request is denied given its alignment with EU goals of sustainable and green development and how it could be improved to a form that could pass and boost green development.This should be provided as a matter of transparency and democratic oversight and accountability.
Prime Minister of United Duchies , John Peter Key
-
On the Complaint Received by the United Duchies
To the Prime Minister of the United Duchies:
The Commission has not yet made a decision on the application that the United Duchies submitted concerning their Cycle Super Highway System project. Therefore, it is still soon to affirm that the proposal has been 'rejected' by the European Commission. As Premier Commissioner, I have urged my colleagues, and I once more urge them to do so in this public letter to you, to vote on the matter so the Commission can deliver a veredict as soon as possible.
Receive my kindest regards,
Jean-Claude Juncker
Premier Commissioner of the European Union -
The One, Holy, Catholic, and Apostolic Church, legally and unfortunately recognized only as the Arian Apostolic Church, warns that it is now highly likely that a major accident will occur on 1 June 2023 at 08:32 IST at the Nuclear Power Plant of the Transfiguration. We implore the Commission to provide funding as soon as is practicable so that we may conduct emergency mitigation to prevent the further deterioration of the reactor core and thus protect the lives and safety of Istkaleners and Europeans.
The Lord be with you,
TABITHA
Supreme PontiffHH Erkas Tilisek
President of the GovernorateHH Sirisik Gingivitis
Secretary of the Office for EnergyHH Merte Maksile
Secretary of the Office for Nuclear Security -
Name of the state: United Duchies
Intended use for the subsidy: Development of Electric or hybrid Passenger Airliner
Requested form of subsidy: Grant(Preferred) or Loan
Amount of money requested (In Euros): 6 billion Euros
5 years
Proposed interest per annum (filled out only if the requested form of subsidy is a low-interest loan): Will listen to comission
Justification for the request: Recognising the carbon footprint of airliners and the issue of adressing aviation emissions. We seek to develop a European airliner with EU funds that is eletric and and can replace jet aircraft in the regional aircraft market of up to 150 passenger capacity planes. If we can move these aircraft to electric or hybrid biofuels-electric airliner. The aim would be to assist manufactaurers such as Airbus with the development of the technology by having a public funded programme to develop the technology to speed up its adoption in the future. This will be a vital step in sustainable economic green development to enable a quick transition to low carbon aviation. -
The One, Holy, Catholic, and Apostolic Church, legally and unfortunately recognized only as the Arian Apostolic Church, warns that it will resort to legal recourse to ensure a response to its legitimate application to the EDA if no acceptance or rejection is given by 15 June 2023.
The Lord be with you,
TABITHA
Supreme PontiffHH Erkas Tilisek
President of the GovernorateHH Sirisik Gingivitis
Secretary of the Office for EnergyHH Merte Maksile
Secretary of the Office for Nuclear Security -
Name of the state: Svarna Surya
Intended use for the subsidy: High Speed Railway construction(Part grant)
Requested form of subsidy: Grant
Amount of money requested (In Euros):5 Billion Euros
Proposed time-frame in which the loan will be payed back (filled out only if the requested form of subsidy is a interest-free loan or a low-interest loan):-
Proposed interest per annum (filled out only if the requested form of subsidy is a low-interest loan): -
Justification for the request: We increasingly need to find more efficient ways to move citizens around because of the traffic congestion on motorways. We believe a high speed rail project from Mumba-Naya Dilli-Agra-Allahabad-Bahawalpur-Sarghoda with a spur to Raipur and Bhopal and to Beirellia
-
Name of the state:Svarna Surya
Intended use for the subsidy:Svarna Highway Link:Development of Highways to be paid back by tolls
Requested form of subsidy:Loan
Amount of money requested (In Euros):4 Billion Euros(part funding)
Proposed time-frame in which the loan will be payed back (filled out only if the requested form of subsidy is a interest-free loan or a low-interest loan):10 years
Proposed interest per annum (filled out only if the requested form of subsidy is a low-interest loan):-
Justification for the request:We need to develop the transportation links between our cities. We are proposing EU loan 4 billion Euros of the 10 billion Euros required to complete 1,000 km of highways connecting core cities down the main corridor in Svarna Surya. The amount will be paid back with tolls generated by the road. -
On the Applications from "Pope" Tabitha and the United Duchies Airliner Proposal
To the interest of "Pope" Tabitha and the Prime Minister of the United Duchies:
The European Commission, formed by Premier Commissioner Jean-Claude Juncker, Internal Affairs Commissioner Wirt Harland and Foreign Affairs Commissioner Antoni Reynels, has reached a decision on these two applications.
-
Concerning the request from "Pope" Tabitha, the Commission has REJECTED the application on a 2-0 vote. The Commission believes that the applicant is a dangerous individual, and a interest-free loan that will be paid in 40 years is completely dangerous to the principle of paying back after the expense of said funds.
-
Concerning the application from the United Duchies Government, the Commission has decided to REJECT the request on a 2-1 vote. The Commission believes that the application goes against the principles of the European Development Agency, that was not created to give loans to private companies like Airbus. In addition, the Commission notes that Airbus is not a fully-Duchian company, and that the United Duchies has not made clear if other states support their idea.
Other pending applications will be responded in due curse.
Receive my kindest regards,
Jean-Claude Juncker
Premier Commissioner of the European Union -
-
Name of the state: United Duchies
Intended use for the subsidy: National Pedestrian Priority areas
Requested form of subsidy: Grant
Amount of money requested (In Euros): 5 Billion Euros
Proposed time-frame in which the loan will be payed back (filled out only if the requested form of subsidy is a interest-free loan or a low-interest loan):N/A
Proposed interest per annum (filled out only if the requested form of subsidy is a low-interest loan): N/A
Justification for the request: To provide a fund to pedestrianise core city centre areas throughout the United Duchies with at least 1 pedestrianised area in every city or town and to pedestrianise core shopping areas. These areas would also have a bike lanes down them to seperate bike traffic with these being protected to funnel bikes away from pedestrians and have service access to vehicles for deliveries during the non-business hours. Businesses would be given funds as part of the programme to switch to cycle deliveries for local areas. The aim would be to increase commerce and access to shops. The creation of low car zones has been proven to increase business by allowing for more passing foot traffic as people will feel safer to shop without cars or not having to worry about crossing the road. Buses would drop off passengers at the end of high streets and supermarkets with car parks would be at the end of the boundary of the pedestrianised zones. Where needed by passes would be built around the towns if the area to be pedestrianised is a main thoroughfare for the region.Where needed park and ride schemes would be created to get people into the shopping areas -
On the Applications from Svarna Surya and the United Duchies
To the interest of the Prime Ministers of Svarna Surya and the United Duchies:
The European Commission, formed by Premier Commissioner Jean-Claude Juncker, Internal Affairs Commissioner Wirt Harland and Foreign Affairs Commissioner Antoni Reynels, has reached a decision on these three applications.
-
Concerning the first request from Svarna Surya, the Commission has ACCEPTED the application on a 3-0 vote. The Commission believes that the applicant request is correct and agrees with the proposal made by Svarna Surya. The use of the European Development Agency funds for this project is reasonable and it is applauded by the members of the Commission.
-
Regarding the second request from Svarna Surya, the Commission has ACCEPTED the application on a 3-0 vote. We believe that Svarna Surya, through the toll system they wish to implement in order to pay back, meets the requisites set by this Commission to be given the necessary funds.
-
Concerning the application from the United Duchies Government, the Commission has decided to REJECT the request on a 2-1 vote. The Commission believes that five billion Euros is a huge amount of money for the proposed project, an argument that becomes stronger when another member state of the European Union is building a high speed railway network with the same amount of money.
Receive my kindest regards,
Jean-Claude Juncker
Premier Commissioner of the European Union -
-
Name of the state:United Duchies
Intended use for the subsidy:Solar Retrofit Programme
Requested form of subsidy:Grants
Amount of money requested (In Euros):5,000,000,000 Euros(preferably per year for 10 years to accelerate the programme)
Proposed time-frame in which the loan will be payed back (filled out only if the requested form of subsidy is a interest-free loan or a low-interest loan):-
Proposed interest per annum (filled out only if the requested form of subsidy is a low-interest loan):-
Justification for the request: To retrofit older buildings in the Duchies with solar systems for electricity backed up by a battery and solar water systems where appropriate. This would part pay for a programme to install systems on almost a million buildings this year with plans to put it on over 30 million existing dwellings over 10 years. The money would go to state owned energy and utility providers who would install them on people houses with householders and building owners getting a reduced electricity rate for agreeing on installations in their property.This would strengthen the grid and increase solar capacity by having batteries storing energy in a decentralized fashion. It will also help with out aim of delivering a home battery pack to every home in the Duchies within 10 years to reduce the effect of short power cuts from the grid side making sure blackouts if they occur for short periods of time don't shut down entire areas.The programme will also increase jobs in installation and therefore economic growth.The cost to install the average solar and smart powerwall system is about 20,000 euros average or so depending on size of property. This grant will part cover the cost of the programme this year.The hope is to drop the price per installation over time.Excess power of there is any on a particular day will be sold to other countries or stored in battery farms that are being built around the country or in electric car batteries through vehicle to grid technology.This is the projected costs and targets:
Type of Building Buildings % Solar Solar on Roof Average Generating Capacity KwH Generation Percent of Solar Target 10 years KwH With Target Projected Cost over 10 years EU Funding % Single Family Homes 25,648,291 8.90% 2,282,698 11000 25,109,677,270 7.26% 20,518,633 225,704,963,000 €364,718,701,327.49 - Apartment Blocks / mixed use 600,864 4.90% 29,442 60900 1,793,038,262 0.52% 525,056 31,975,910,400 €17,114,654,932.50 - Other buildings 1,966,543 6.90% 135,691 70,350 9,545,894,703 2.76% 1,253,850 88,208,347,500 €83,861,889,975.00 - Total 28,215,698 20.70% 2,447,832 14,890 36,448,610,236 10.53% 22,297,539 345,889,220,900 €478,317,411,142.49 10.45% -
On the Applications from the United Duchies
To the attention of the government of the United Duchies:
The European Commission has reached a decision on the following two applications:
-
The subsidy request for the Cycle Super Highway System has been denied by a 3-0 vote, as the proposed project is seen as expensive and unlikely to create proportional benefit.
-
In regards to the subsidy request for the Solar Retrofit Program: the European Commission, in light of the cost and relative luxury of the proposed project, proposes, by 3-0 vote, a counter-offer of a single low-interest loan of 10 billion euros, at 1.8% interest and to be repaid in 15 years.
Wishing you continued and future happiness,
Akem Linek
Premier Commissioner of the European Union -